When an OEM sends us a drawing for a new metal component, it tells us what the finished part needs to look like and how it’s expected to function. But there’s a difference between having an approved design and knowing how accurately a manufacturing setup is producing it.
Consider a stamped bracket with several mounting holes that need to line up with another component. If the hole locations are off—even slightly—the customer could run into problems during assembly. The same concern applies to formed features or close-tolerance dimensions on machined parts.
At Clow, we manufacture a wide variety of custom metal parts, so we’re accustomed to working with different specifications from one project to the next. First article inspection (FAI) is one of the quality processes we use to check initial manufactured parts against those requirements before moving further into production.
A Closer Look at First Article Inspection
First article inspection involves measuring and evaluating an initial production part or representative sample against the approved engineering requirements. It’s commonly used when a new part enters production, although certain changes to an existing design or manufacturing setup also call for another inspection.
The inspection itself depends on the component. If we’re manufacturing a stamped part with several formed features, the drawing specifies the required bend angles or hole positions. For a standalone machined component, the inspection could focus on a bore diameter or a surface that needs to mate with another part.
The idea is to confirm that the manufacturing equipment and setup are producing a part that meets the customer’s specifications.
FAI also differs from inspecting a prototype. Prototypes help evaluate a design before production tooling or processes are finalized. First articles are generally produced using the intended production methods, giving the manufacturer a chance to evaluate the actual production output.
Some customers require a formal first article report, complete with specific reporting formats and approval procedures. Establishing the inspection and documentation requirements ahead of time helps both parties understand what needs to be verified before production proceeds.
Catching Problems While There’s Still Time to Correct Them
A small dimensional problem doesn’t necessarily mean a part is unusable, but a measurement outside the drawing requirements calls for investigation.
Let’s say a formed flange isn’t meeting its specified angle. At first glance, the part looks acceptable, but the measured angle falls outside the customer’s tolerance. The manufacturing team needs to determine why. The press setup or tooling could be contributing to the discrepancy.
Identifying a discrepancy in the initial part gives the manufacturing team an opportunity to investigate the cause and make adjustments before production continues. This helps reduce the risk of producing additional parts that fall outside the required specifications. Catching dimensional issues early can also help avoid costly rework, replacement parts and potential delays to the customer’s assembly schedule.
This is particularly relevant to the high-mix, low-volume manufacturing work we do at Clow. We handle a diverse mix of components with different geometries and production requirements. Inspection needs to account for the individual part rather than relying on the same set of measurements for every job.
What Happens During the Inspection?
The engineering drawing is the starting point for determining what needs to be inspected. Dimensions and tolerances establish the criteria for evaluating the manufactured component, along with any additional requirements identified by the customer.
Some measurements are relatively straightforward; some require equipment capable of evaluating features that are difficult to check accurately with conventional hand tools.
Clow’s Quality Department uses Coordinate Measuring Machines (CMMs), Keyence image measurement systems, optical comparators, and other precision measuring equipment. A CMM, for example, is useful for evaluating the location of features in relation to defined reference points on a part. Image measurement systems offer another way to evaluate certain dimensions and geometric features.
The appropriate equipment depends on the part and what the drawing requires.
Material verification also comes into play when specified by the customer. If a drawing calls for a particular grade or thickness of metal, supporting records help document conformance with those requirements.
Once measurements are collected, they’re compared with the specifications. Any nonconforming characteristics require review, and the necessary follow-up depends on the nature of the issue and the customer’s approval requirements.
Having the inspection information documented gives both parties something concrete to reference if questions come up during production.
When an Inspection Leads to a Manufacturing Adjustment
Our team at Clow works with customers early in development to discuss manufacturability, including how part geometry and tolerances relate to the proposed manufacturing method.
Sometimes those conversations identify an issue before production begins. Other times, an initial inspection provides information that calls for another look at the manufacturing setup.
Having in-house tooling resources is helpful in these situations. Clow designs, manufactures, maintains, and repairs tooling used in our operations. If an inspection points to a potential tooling issue, our manufacturing and tooling teams have the resources to investigate and determine what adjustments are appropriate.
Customer communication is part of the discussion, too. Occasionally, an inspection finding raises questions about a drawing requirement, particularly when a feature’s intended function affects how the issue should be addressed.
We’ve always valued working closely with the people who design and source the parts we manufacture. Understanding what the customer expects from the finished component helps us approach production with those requirements in mind.
Quality Checks Don’t End with the First Article
Even after an acceptable first article has been produced, there’s ongoing work involved in maintaining quality throughout the run.
Production teams sometimes need to adjust equipment settings, and tooling experiences wear over time. Depending on the manufacturing operation, dimensional variation can develop after the initial pieces have been inspected.
At Clow, inspection frequency is established according to part complexity, with higher-than-standard checking frequencies used when appropriate. We also use Statistical Process Control (SPC) as part of our quality practices to help monitor variation during manufacturing.
Our approach includes mistake-proofing methods such as Poka-Yoke and nesting features, which help prevent certain errors related to part positioning or manufacturing operations.
For projects with additional customer requirements, our quality processes also include Production Part Approval Process (PPAP), Advanced Product Quality Planning (APQP), and lot traceability. The specific requirements depend on the work being performed.
Clow maintains an ISO 9001:2015-certified quality management system, which provides a framework for documented processes and continual improvement. Among the quality certifications OEMs often look for in a manufacturing supplier, ISO 9001 demonstrates that an organization has an established quality management system assessed against an internationally recognized standard.
For our customers, the inspection work and manufacturing controls behind that system are part of our commitment to delivering parts that meet their specifications.
Let’s Talk About Your Next Metal Component
Clow works with OEMs on a wide range of custom metal stampings, fabrications, and precision machining projects. Our experience with high-mix, low-volume manufacturing has given us an appreciation for how much requirements vary from one part to another.
If you’re developing a new component, we’d welcome the opportunity to review your drawings and talk through the manufacturing requirements with you. We can also discuss quality expectations early, including any first article inspection or documentation requirements associated with your project.